Latent budget analysis is a method for the analysis of a two-way contingency table with an exploratory variable and a response variable. It is specially designed for compositional data.
Version: | 1.0 |
Depends: | R (≥ 3.1.2), MASS, alabama, plotrix, ca |
Published: | 2015-01-22 |
Author: | Enio G. Jelihovschi Ivan Bezerra Allaman |
Maintainer: | Enio G. Jelihovschi <eniojelihovs at gmail.com> |
License: | GPL-2 | GPL-3 [expanded from: GPL (≥ 2)] |
NeedsCompilation: | no |
CRAN checks: | lba results |
Reference manual: | lba.pdf |
Package source: | lba_1.0.tar.gz |
Windows binaries: | r-devel: lba_1.0.zip, r-release: lba_1.0.zip, r-oldrel: not available |
OS X Snow Leopard binaries: | r-release: lba_1.0.tgz, r-oldrel: not available |
OS X Mavericks binaries: | r-release: lba_1.0.tgz |