Maximum Likelihood Estimation of Stochastic Frontier Production and Cost Functions. Two specifications are available: the error components specification with time-varying efficiencies (Battese and Coelli, 1992) and a model specification in which the firm effects are directly influenced by a number of variables (Battese and Coelli, 1995).
Version: | 1.1-0 |
Depends: | R (≥ 2.15.0), micEcon (≥ 0.6-1), lmtest (≥ 0.9-24) |
Imports: | moments (≥ 0.11), stats (≥ 2.15.0), Formula (≥ 0.2-0), miscTools (≥ 0.6-1) |
Suggests: | plm (≥ 1.0-1), MCMCpack (≥ 1.0-8), fdrtool (≥ 1.2.6) |
Published: | 2013-08-20 |
Author: | Tim Coelli, Arne Henningsen |
Maintainer: | Arne Henningsen <arne.henningsen at gmail.com> |
License: | GPL-2 | GPL-3 [expanded from: GPL (≥ 2)] |
URL: | http://frontier.r-forge.r-project.org/ |
NeedsCompilation: | yes |
Citation: | frontier citation info |
Materials: | NEWS |
In views: | Econometrics |
CRAN checks: | frontier results |
Reference manual: | frontier.pdf |
Package source: | frontier_1.1-0.tar.gz |
Windows binaries: | r-devel: frontier_1.1-0.zip, r-release: frontier_1.1-0.zip, r-oldrel: frontier_1.1-0.zip |
OS X Mavericks binaries: | r-release: frontier_1.1-0.tgz, r-oldrel: frontier_1.1-0.tgz |
Old sources: | frontier archive |
Please use the canonical form https://CRAN.R-project.org/package=frontier to link to this page.